Heat supply community Mellach

Biomass project

Topic area
Agriculture and forestry, incl. value chain

Disaggregation level
Renewable energy
Diversification

Project region
Styria

LE– Programming Period
LE 07–13

Project period
2010-2011

Project costs overall
66.700 EUR

Project initiator
WLG Mellach GesbR

LE 07-13 information

Themenbereich (Untergliederung): Forstwirtschaft (Biomasse)
Themenbereich (Untergliederung): Zukunft Land (Diversifizierung)
Maßnahme: M311

Short description

A heating and storage room is integrated into a farm building. The heat generation takes place by means of a 150 kW biomass boiler plant with rotation worm, puffer tank and solar plant. Two multi-storey residential buildings with a total of 20 flats, the municipal office, the kindergarten and two one-family houses have been connected.

Point of departure

Wood chip heating

Targets and target groups

Heating in a cheap, ecological and regional way

Project implementation and measures

Thermal energy is flowing via a 440 m long short-distance heat network to the customers and is measured and charged by means of heat meter. In order to reduce the boiler start a buffer has been installed which is also loaded by a solar plant. In order to reduce grid losses and pump electricity costs in summer buffer tanks are only loaded at the customers’ if required.
The first expansion level was taken into operation in autumn 2009. The further expansion took place in spring 2010 with the connection of further clients.

Results and effects

● Thermal utilisation of farm-based residual forest wood
● Safeguarding of farm-based jobs
● Employment for local enterprises
● Reduction of CO2 emissions
● Improvement of the air quality by means of the replacement of old central heating systems

Erfahrung

Wood procurement is not required all over the year, but takes place in a reduced manner in the course of a period of 1 to 2 months.